Technics

Carburization Prevention Treatment,Process 1:202 Coating Material

Views : 5262
Update time : 2015-10-29 10:53:29

Carburization Prevention Treatment,Process 1:202 Coating Material

To avoid Carburization brittleness,which may occur during pipe casting and which can result in fracture of cooling water pipes with repeated expansion when heated up and contraction when cooled down during service,carburization prevention treatment must be done on water pipes.

1 The main material is metal oxide,green color.

2 Treating method:spray coating ,brush coating or dip coating,at low cost.

3 Coating thickness:0.2~0.3mm.

4 Carburization prevention effect:

Chemical analysis:average carburization0.08% within the range of 1mm depth.

Metallurgical analysis:no eutectoid steel layer.

Gap between water pipe and the mother material0.12mm

Water pipe tensile strength:#10 steel300MPa

                                            #20 steel400MPa

Water pipe elongation:#10 steel26%

                                    #20 steel23%

Cast Iron Stave Cooler, Water-Cooling Converter Mouth, Cast Iron Tuyere Cooler, Cast Copper Tuyere Cooler, Chequer supports, Cast Iron Water Jaker stave cooler cooling stave cast iron stave cooler blast furnace stave cooler blast furnace cooling stave cast iron cooling stave

 

Related News
Read More >>
The Unseen Heroes Bearing the Furnace's Burden The Unseen Heroes Bearing the Furnace's Burden
Nov .04.2024
The throat armour plates is a critical component of a blast furnace, providing essential protection and ensuring efficient operation.
The Unseen Heroes Bearing the Furnace's Burden The Unseen Heroes Bearing the Furnace's Burden
Oct .31.2024
The throat armour plates is a critical component of a blast furnace, providing essential protection and ensuring efficient operation.
Hot Blast Stove Chequer Support Ushered in Preliminary Inspection Hot Blast Stove Chequer Support Ushered in Preliminary Inspection
Jul .19.2024
Customers from the UK and Brazil recently visited Tianyu's factory for inspection and product acceptance.
BF Stave Cooler Passed Inspection BF Stave Cooler Passed Inspection
Jul .03.2024
Our Blast Furnace Stave Cooler, recently produced for a client in Europe, has successfully passed their on-site quality inspection.